3<br />

MT10426<br />

MT10865<br />

MT10866<br />

Protection functions Phase undercurrent<br />

ANSI code 37<br />

Operation Block diagram<br />

This protection is single-phase:<br />

b it picks up when phase 1 current drops below the Is<br />

set point<br />

b it is inactive when the current is less than 10 % of Ib<br />

b it is insensitive to current drops (breaking) due to<br />

circuit breaker tripping<br />

b it includes a definite time delay T.<br />

3/8<br />

DE50367<br />

Characteristics<br />

Is set point<br />

Setting 15 % Ib y Is y 100 % Ib by steps of 1 %<br />

Accuracy (1) Pick-up/drop-out ratio<br />

T time delay<br />

±5 %<br />

106 % ±5 % for Is > 0.1 In<br />

Setting<br />

Accuracy<br />

50 ms y T y 300 s<br />

(1) t<br />

T<br />

0 0,1 Ib Is I<br />

±2 % or ±25 ms<br />

Resolution 10 ms or 1 digit<br />

Operating principle Characteristic times<br />

1.06 Is<br />

Is<br />

0.1 Ib<br />

“pick-up”<br />

signal<br />

time-delayed<br />

output<br />

Case of current sag.<br />

1.06 Is<br />

Is<br />

0.1 Ib<br />

“pick-up”<br />

signal = 0<br />

time-delayed<br />

output = 0<br />

Case of circuit breaker tripping.<br />

<br />

0.1 Ib<br />

15 ms<br />

Operating time < 50 ms<br />

Overshoot time < 35 ms<br />

Reset time < 40 ms<br />

(1) In reference conditions (IEC 60255-6).<br />

0<br />

&<br />

T<br />

0<br />

time-delayed<br />

output”<br />

“pick-up”<br />

signal<br />

PCRED301005EN - 06/<strong>20</strong>08