Commissioning Checking the residual voltage<br />

input connection<br />

PCRED301005EN - 06/<strong>20</strong>08<br />

DE52247<br />

Description<br />

Check to be carried out for Sepam B21 or B22, when the residual voltage is<br />

measured by 3 VTs on the secondary circuits connected in an open delta<br />

arrangement.<br />

Procedure<br />

1. Connect the single-phase voltage generator to the test terminal box using the plug<br />

provided, in accordance with the diagram below:<br />

2. Turn on the generator.<br />

3. Apply the VT secondary rated phase-to-neutral voltage (Uns/3).<br />

4. Use the SFT2841 software to check the residual voltage value V0.<br />

5. V0 should be equal to the VT primary rated phase-to-neutral voltage (Unp/3 or<br />

Vnp) if the VTs deliver Uns/3 to the secondary circuit.<br />

6. V0 should be equal to the VT primary rated phase-to-phase voltage (Unp or<br />

3Vnp) if the VTs deliver Uns/3 to the secondary circuit.<br />

7. Turn off the generator.<br />

8. Put the cover back on the test terminal box.<br />