14.11.2012 Views

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Control and monitoring<br />

functions<br />

PCRED301005EN - 06/<strong>20</strong>08<br />

Self-tests and fail-safe position<br />

Selecting the trip command and examples of<br />

use<br />

An analysis of the operational reliability of the whole installation should determine<br />

whether availability or safety of this installation should be prioritized if Sepam is in the<br />

fail-safe position. This information is used to determine the choice of trip command as<br />

outlined in the table below.<br />

CAUTION Selecting the trip command<br />

RISK OF UNPROTECTED INSTALLATION<br />

Diagram Control Event Trip Advantage Disadvantage<br />

Always connect the watchdog output to a<br />

1 Shunt trip breaker Sepam failure or No Availability of Installation not<br />

monitoring device when the selected trip<br />

or mechanical loss of the<br />

the installation protected until<br />

command does not result in the installation<br />

tripping when Sepam fails.<br />

latching contactor auxiliary power<br />

supply<br />

remedial<br />

intervention<br />

Failure to follow these instructions can cause<br />

equipment damage.<br />

(1)<br />

2 Breaker with<br />

undervoltage trip<br />

Sepam failure or Yes<br />

loss of the<br />

Safety of the<br />

installation<br />

Installation not<br />

available until<br />

coil (fail-safe) auxiliary power<br />

remedial<br />

supply<br />

intervention<br />

3 Breaker with Sepam failure No Availability of Installation not<br />

undervoltage trip<br />

the installation protected until<br />

coil (not fail-safe)<br />

remedial<br />

intervention (1)<br />

Loss of auxiliary Yes Safety of the Installation not<br />

power supply<br />

installation available until<br />

remedial<br />

intervention<br />

(1) It is essential to use the watchdog, see the warning notice opposite.<br />

DE80351<br />

Inhibit closing<br />

Closing<br />

O2<br />

O11<br />

N/O<br />

closing<br />

coil<br />

8<br />

7<br />

L<br />

2<br />

3<br />

O1<br />

Trip<br />

5<br />

4<br />

Example of use with shunt trip coil (diagram 1)<br />

Shunt<br />

trip<br />

coil<br />

Breaker closed Breaker open<br />

4 M 1 M<br />

5 I12 2 I11<br />

Setting the Sepam output parameters:<br />

O1: N/O<br />

O2: N/C<br />

O11: N/O<br />

4/19<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!