14.11.2012 Views

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6<br />

058731N<br />

Installation 1 A/5 A Current transformers<br />

ARJA1. ARJP3.<br />

6/16<br />

058733N<br />

Function<br />

Sepam may be connected to any standard 1 A and 5 A current transformer.<br />

<strong>Schneider</strong> <strong>Electric</strong> offers a range of current transformers to measure primary<br />

currents from 50 A to 2500 A.<br />

Please consult us for further information.<br />

Sizing of current transformers<br />

Current transformers should be dimensioned so as not to become saturated by the<br />

current values they are required to measure accurately (minimum 5 In).<br />

For overcurrent protection<br />

b Definite time:<br />

The saturation current must be more than 1.5 times the setting value.<br />

b IDMT:<br />

The saturation current must be more than 1.5 times the highest working value<br />

on the curve.<br />

Practical solution when there is no information on the settings<br />

Rated secondary<br />

current in<br />

Rated<br />

burden<br />

Accuracy<br />

class<br />

CT secondary<br />

resistance RCT<br />

Wiring<br />

resistance Rf<br />

1 A 2.5 VA 5P <strong>20</strong> < 3 Ω < 0.075 Ω<br />

5 A 7.5 VA 5P <strong>20</strong> < 0.2 Ω < 0.075 Ω<br />

PCRED301005EN - 06/<strong>20</strong>08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!