14.11.2012 Views

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Commissioning Test sheet<br />

Sepam series <strong>20</strong><br />

Project:................................................................. Type of Sepam<br />

Switchboard: ....................................................... Serial number<br />

Cubicle:................................................................ Software version V<br />

Overall checks<br />

Check the box v when the check has been made and is conclusive<br />

Type of check<br />

Preliminary general examination, prior to energizing v<br />

Energizing v<br />

Parameter and protection settings v<br />

Logic input connection v<br />

Logic output connection v<br />

Validation of the complete protection chain v<br />

Analog output connection to the MSA141 module v<br />

Temperature sensor input connection to the MET148-2 module (for type T<strong>20</strong>, T23 or M<strong>20</strong>) v<br />

Checking of Sepam S<strong>20</strong>, S23, T<strong>20</strong>, T23 or M<strong>20</strong> current inputs<br />

Type of check Test performed Result Display<br />

Phase current input Secondary injection of CT rated primary current<br />

connection<br />

CT rated current,<br />

i.e. 1 A or 5 A<br />

I1 =....................<br />

I2 =....................<br />

v<br />

Residual current value<br />

obtained by 3 phase CTs<br />

Residual current input<br />

connection to a specific<br />

sensor:<br />

b CSH1<strong>20</strong> or CSH<strong>20</strong>0<br />

b Other core balance CT +<br />

ACE990<br />

b 1 x 1 A or 5 A CT<br />

PCRED301005EN - 06/<strong>20</strong>08<br />

Secondary injection of<br />

CT rated current,<br />

i.e. 1 A or 5 A<br />

Injection of 5 A into primary<br />

circuit of core balance CT or<br />

CT<br />

Checking of Sepam B21 or B22 voltage inputs<br />

CT rated primary current<br />

Injected current value<br />

Type of check Test performed Result Display<br />

Phase voltage input<br />

connection<br />

Residual voltage value<br />

obtained by 3 phase VTs<br />

Residual voltage input<br />

connection<br />

Secondary injection of VT<br />

rated phase-to-neutral<br />

voltage Uns/3<br />

Secondary injection of VT<br />

rated phase-to-neutral<br />

voltage Uns/3<br />

Secondary injection of<br />

voltage Uns/3<br />

I3 =....................<br />

I0 =.................... v<br />

I0 =.................... v<br />

VT primary rated<br />

phase-to-neutral voltage Unp/3 V1 = ................... v<br />

V2 = ..................<br />

V3 = ..................<br />

VT primary rated<br />

phase-to-neutral voltage Unp/3 V0 = .................. v<br />

Residual voltage<br />

= Unp/3 (if Uns/3 VT)<br />

= Unp (if Uns/3 VT)<br />

V0 = .................. v<br />

Tests performed on: ...................................................................... Signatures<br />

By: ...................................................................................................<br />

Comments:<br />

......................................................................................................................................................................................................<br />

......................................................................................................................................................................................................<br />

7/33<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!