14.11.2012 Views

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3<br />

Protection functions Phase-to-phase overvoltage<br />

ANSI code 59<br />

3/28<br />

MT10876<br />

Operation<br />

This protection is three-phase:<br />

b it picks up when one of the phase-to-phase voltages concerned is greater than<br />

the Us set point<br />

b the protection includes a definite time delay.<br />

Block diagram<br />

U21<br />

U32<br />

U13<br />

Characteristics<br />

Us set point<br />

U > Us<br />

Setting 50 % Unp to 150 % Unp (2)<br />

Accuracy (1) ±2 % or 0.005 Unp<br />

Resolution 1 %<br />

Drop-out/pick-up ratio<br />

Time delay T<br />

97 % ±1 %<br />

Setting 50 ms to 300 s<br />

Accuracy (1) ±2 %, or ±25 ms<br />

Resolution<br />

Characteristic times<br />

10 ms or 1 digit<br />

Operation time pick-up < 35 ms (typically 25 ms)<br />

Overshoot time < 35 ms<br />

Reset time<br />

(1) In reference conditions (IEC 60255-6).<br />

(2) 135 % Unp with TP 230 V / 3.<br />

< 40 ms<br />

T<br />

0<br />

time-delayed output<br />

“pick-up” signal<br />

PCRED301005EN - 06/<strong>20</strong>08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!