DE80236<br />

Commissioning Maintenance<br />

About SFT2841<br />

Please use SFT2841<br />

10.0<br />

SFT2841 compatible version screen.<br />

PCRED301005EN - 06/<strong>20</strong>08<br />

DANGER<br />

HAZARD OF ELECTRIC SHOCK, ELECTRIC<br />

ARC OR BURNS<br />

b Only qualified personnel should maintain this<br />

equipment. Such work should be performed only<br />

after reading this entire set of instructions.<br />

b NEVER work alone.<br />

b Obey all existing safety instructions when<br />

commissioning and maintaining high-voltage<br />

equipment.<br />

b Beware of potential hazards and wear personal<br />

protective equipment.<br />

Failure to follow these instructions will result<br />

in death or serious injury.<br />

Compatibility of Sepam version/SFT2841 version<br />

The About SFT2841 screen indicates the minimum version of SFT2841 that is<br />

compatible with the Sepam being used.<br />

To display this screen on the Sepam UMI, press the key several times to bring<br />

up the SFT2841 compatible version screen.<br />

Check that the SFT2841 software version used is higher than or the same as that<br />

indicated on the Sepam screen.<br />

If the SFT2841 software version is lower than the minimum version compatible with<br />

the Sepam being used, the SFT2841 software cannot be connected to Sepam and<br />

the SFT2841 software displays the following error message: SFT2841 software<br />

version incompatible with the connected device.<br />

Preventive maintenance<br />

General<br />

The logic inputs and outputs and the analog inputs are the parts of Sepam least<br />

covered by the self-tests. (See “List of self-tests which place Sepam in the fail-safe<br />

position” page 4/17).<br />

They should be tested during a maintenance operation.<br />

The recommended interval between preventive maintenance operations is 5 years.<br />

Maintenance tests<br />

To perform maintenance on Sepam, see section “Commissioning: principles and<br />

method” page 7/21. Carry out all the recommended commissioning tests according<br />

to the type of Sepam to be tested.<br />

First test all the logic inputs and outputs involved in tripping the circuit breaker.<br />

A test of the complete chain including the circuit breaker is also recommended.<br />

7/35<br />

7