14.11.2012 Views

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Protection functions Phase-to-neutral undervoltage<br />

ANSI code 27S<br />

PCRED301005EN - 06/<strong>20</strong>08<br />

MT10874<br />

Operation<br />

This protection is three-phase:<br />

b it picks up when one of the 3 phase-to-neutral voltages drops below the Vs set<br />

point<br />

b it has 3 independent outputs available for the control matrix<br />

b it is operational if the number of VTs connected is V1, V2, V3 or U21, U32 with<br />

measurement of V0.<br />

Block diagram<br />

V1<br />

V2<br />

V3<br />

V1 < Vs<br />

V2 < Vs<br />

V3 < Vs<br />

Characteristics<br />

Vs set point<br />

Setting 5 % Vnp to 100 % Vnp<br />

Accuracy (1) ±2 % or 0.005 Vnp<br />

Resolution 1 %<br />

Drop-out/pick-up ratio<br />

Time delay T<br />

103 % ±2.5 %<br />

Setting 50 ms to 300 s<br />

Accuracy (1) ±2 %, or ±25 ms<br />

Resolution<br />

Characteristic times<br />

10 ms or 1 digit<br />

Operation time pick-up < 35 ms (typically 25 ms)<br />

Overshoot time < 35 ms<br />

Reset time<br />

(1) In reference conditions (IEC 60255-6).<br />

< 40 ms<br />

T<br />

T<br />

T<br />

1<br />

0<br />

0<br />

0<br />

time-delayed output<br />

time-delayed output<br />

time-delayed output<br />

“pick-up” signal<br />

3/7<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!