13.07.2015 Views

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

InstallationTable 3–15. Throw Rod Point Pressure Verification Procedure (Cont.)StepAction4 Turn on the Portable Load Indicator from the <strong>Switch</strong> Machine and LayoutLoad Sensing Kit.On/Off KnobPORTABLELOAD INDICATORMODEL PLN- D2S/N 0746OFF BAL CAL-CHKSTRAINWEST CONSHOHOCKEN PA., USA.5 Observe the indicator while actuating the switch machine to determine thepoint pressure generated when the switch is thrown.6 Perform any adjustments and repeat Step 4 to obtain desired force.7 Turn off Portable Load Indicator and disconnect the <strong>Switch</strong> Machine andLayout Sensing Kit Cable from the Clevis Pin and Portable Load Indicator.8 Remove the Clevis Pin from the Jaw Rod.9 Reinstall the bolt connecting the Jaw Rod to the Throw Bar Connector.10 Return switch machine back to service if no further testing or verification isrequired.P1293, Rev. Jun/07 3–39 <strong>Alstom</strong> Signaling Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!