13.07.2015 Views

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

InstallationTable 3–12. Changing Over Procedure For Two Locks And Two Point-Detector Rods,Right- And Left-Hand (RH And LH) Double Slip <strong>Switch</strong> (Cont.)StepAction5 Pull both lock and point detector rods as a unit out of one side of machineand insert into machine from opposite side.When installing the detector rods be sure that the rods are aligned below therollers and do not catch the edge of the spacer adjacent to the rollers.CAUTIONSlide the rods by hand. Never tap the end of a rod with ahammer to force it to slide. Failure to lift the center yoke androllers before sliding the rods, or applying unnecessary forcewith a hammer can cause damage to the roller support pins oryoke casting.6 Verify set of rods previously nearer motor end of machine is now nearerwire-entrance end.7 Replace lugs and lock and adjusting nuts on solid-through lock and pointdetectorrods.8 Replace two clips on top of each set of lock rods.P1293, Rev. Jun/07 3–26 <strong>Alstom</strong> Signaling Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!