13.07.2015 Views

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

Models 5E, 5F, 5G & 5H Electric Switch Machines: Single ... - Alstom

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Corrective MaintenanceTable 6–7. <strong>Switch</strong> Machine Disassembly and Assembly Procedure (Cont.)StepAction52 Slide the bearing assembly (35) along the detector rod and into the frame.Tighten the bearing with the two retaining bolts (36).Secure the filler block the filler block retaining bolt (37) from the wear plateassembly and machine frame.53 Install the heater complete (25) and wires (24), making sure that the wiresare correctly connected.Tighten the nuts (23) that hold the heater complete.54 CAUTIONIf wires were not labeled during disassembly, refer to wiringdiagram. Incorrect wiring could cause damage to theequipment.Connect all wires to the point detector.For <strong>Models</strong> <strong>5E</strong> and <strong>5G</strong> continue to Step 55; for <strong>Models</strong> <strong>5F</strong> and <strong>5H</strong> skip toStep 56.P1293, Rev. Jun/07 6–26 <strong>Alstom</strong> Signaling Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!