532 <strong>India</strong> <strong>2018</strong><br />

management schemes funded by Central Govt. and important flood<br />

management schemes funded by state government.<br />

Bansagar Control Board<br />

Bansagar Control Board is another subordinate office of the Ministry. The Board<br />

was set up in 1976. This Board resolution was set up in 1973 for sharing the<br />

waters of river Sone and the cost of the Bansagar Dam.<br />

Betwa River Board<br />

Betwa River Board (B.R.B) was constituted in 1976 to execute the Rajghat Dam<br />

Project and Power House. The project authority started construction of the project<br />

under the overall guidance of Betwa River Board Act, 1976. The benefits and<br />

cost of the this project are shared equally by Uttar Pardesh and Madhya Pardesh.<br />

Construction of dam upto top level was completed with installation of radial<br />

gates. Since then the impounding of water is being done regularly for generation<br />

of power and irrigation in both the states. Impounding of water during monsoon<br />

2015 was done upto FRL. 371.00 and 369 lakh units of power were generated<br />

during the year 2015-16. The reservoir created by the Rajghat Dam has been<br />

renamed as "Rani Laxmibai Sagar".<br />

Rajghat Power House, is a joint venture of U.P. and M.P Electricity Boards,<br />

envisages construction of a power house with installed capacity of 3 X 15 MW<br />

at the toe of Rajghat Dam. The project estimate was approved by Planning<br />

Commission.<br />

Sardar Sarovar Construction Advisory Committee<br />

The Sardar Sarovar Construction Advisory Committee (SSCAC) was constituted<br />

by the Government of <strong>India</strong> in accordance with the directives of the Narmada<br />

Water Disputes Tribunal (NWDT) in 1980. Its functions include : scrutinize the<br />

project estimates of dam and powerhouse works and recommend for the<br />

administrative approval; examine and make recommendations on all proposals<br />

pertaining to technical features and designs; examine and make<br />

recommendations on the programme of construction of different parts of the<br />

project in a coordinated manner; and examine and recommend delegation of<br />

powers - both technical and financial - to the officers engaged in the execution<br />

of the project.<br />

Present Status of Sardar Sarovar Project<br />

The construction of main dam was started in April 1987. The spillway blocks of<br />

the dam couldn't be raised to full height due to litigation in Supreme Court,<br />

R&R and environmental issues. The present height of spillway blocks is 121.92<br />

m since December 2006. Over the years SSCAC has contributed effectively in<br />

all technical, financial, administrative matters related to the project to the full<br />

satisfaction of the participating states. The majority of the Unit-I and Unit-III<br />

works are completed. This has been achieved through number of meeting/<br />

discussions/ negotiations and inter departmental and interstate interactions.