<strong>DOH</strong> CUSTOMIZED PROCUREMENT MANUAL VOLUME 4 2010<br />
be owned/leased/under purchase by <strong>the</strong> bidder <strong>for</strong> use in <strong>the</strong> contract<br />
under bidding, as well as checking <strong>the</strong> per<strong>for</strong>mance <strong>of</strong> <strong>the</strong> bidder in its<br />
ongoing government and private contracts (if any <strong>of</strong> <strong>the</strong>se on-going<br />
contracts shows a reported negative slippage <strong>of</strong> at least fifteen percent<br />
(15%), or substandard quality <strong>of</strong> work as per contract plans and<br />
specifications, or unsatisfactory per<strong>for</strong>mance <strong>of</strong> <strong>the</strong> contractor‟s<br />
obligations as per contract terms and conditions, at <strong>the</strong> time <strong>of</strong> inspection,<br />
and if <strong>the</strong> BAC verifies any <strong>of</strong> <strong>the</strong>se deficiencies to be due to <strong>the</strong><br />
contractor‟s fault or negligence, <strong>the</strong> agency shall disqualify <strong>the</strong> contractor<br />
from <strong>the</strong> award), <strong>for</strong> <strong>the</strong> <strong>procurement</strong> <strong>of</strong> infrastructure projects;<br />
iii.<br />
iv.<br />
Verification and/or inspection and testing <strong>of</strong> <strong>the</strong> goods/product, after-sales<br />
and/or maintenance capabilities, in applicable cases, <strong>for</strong> <strong>the</strong> <strong>procurement</strong><br />
<strong>of</strong> goods; and<br />
Ascertainment <strong>of</strong> <strong>the</strong> sufficiency <strong>of</strong> <strong>the</strong> bid security as to type, amount,<br />
<strong>for</strong>m and wording, and validity period.<br />
c. Financial Requirements.<br />
3.2 Period <strong>of</strong> Action<br />
To verify, validate and ascertain <strong>the</strong> bid price proposal <strong>of</strong> <strong>the</strong> bidder and,<br />
whenever applicable, <strong>the</strong> required CLC in <strong>the</strong> amount specified and over <strong>the</strong><br />
period stipulated in <strong>the</strong> Bidding Documents, or <strong>the</strong> bidder‟s NFCC to ensure that<br />
<strong>the</strong> bidder can sustain <strong>the</strong> operating cash flow <strong>of</strong> <strong>the</strong> transaction (Section 34.3<br />
<strong>of</strong> <strong>the</strong> revised IRR).<br />
The post-qualification process shall be completed in not more than seven (7) calendar<br />
days from <strong>the</strong> determination <strong>of</strong> <strong>the</strong> HRB. In exceptional cases, <strong>the</strong> post-qualification<br />
period may be extended by <strong>the</strong> HOPE, but in no case shall <strong>the</strong> aggregate period exceed<br />
thirty (30) calendar days (Section 34.8 <strong>of</strong> <strong>the</strong> revised IRR).<br />
3.3 Participants<br />
The following parties ought to be involved in <strong>the</strong> conduct <strong>of</strong> post-qualification:<br />
a. BAC;<br />
b. TWG;<br />
c. BAC Secretariat; and<br />
d. Consultant, ranked starting from bidder with <strong>the</strong> HRB.<br />
79