<strong>DOH</strong> CUSTOMIZED PROCUREMENT MANUAL VOLUME 4 2010<br />
Immediately after <strong>the</strong> BAC has notified <strong>the</strong> first bidder <strong>of</strong> its post-disqualification,<br />
and notwithstanding any pending request <strong>for</strong> reconsideration <strong>the</strong>re<strong>of</strong>, <strong>the</strong> BAC<br />
shall initiate and complete <strong>the</strong> same post-qualification process on <strong>the</strong> bidder with<br />
<strong>the</strong> second HRB. If <strong>the</strong> second bidder passes <strong>the</strong> post-qualification, and provided<br />
that <strong>the</strong> request <strong>for</strong> reconsideration <strong>of</strong> <strong>the</strong> first bidder has been denied, <strong>the</strong> second<br />
bidder shall be post-qualified as <strong>the</strong> bidder with <strong>the</strong> Highest Rated Responsive Bid<br />
(Section 34.6 <strong>of</strong> <strong>the</strong> Revised IRR).<br />
If <strong>the</strong> second bidder, however, fails <strong>the</strong> post-qualification, <strong>the</strong> procedure <strong>for</strong> postqualification<br />
shall be repeated <strong>for</strong> <strong>the</strong> bidder with <strong>the</strong> next HRB, and so on until <strong>the</strong><br />
HRRB, as <strong>the</strong> case may be, is determined <strong>for</strong> award, subject to Section 37 <strong>of</strong> <strong>the</strong><br />
revised IRR (Section 34.7 <strong>of</strong> <strong>the</strong> revised IRR).<br />
3.7 Failure <strong>of</strong> all qualified bidders to pass post-qualification<br />
4. PROCEDURES<br />
If no bidder passes post-qualification, <strong>the</strong> BAC should declare <strong>the</strong> bidding a failure. In such<br />
a case, <strong>the</strong> BAC shall issue a Resolution declaring a failure <strong>of</strong> bidding. In order to<br />
determine <strong>the</strong> reason <strong>for</strong> <strong>the</strong> failed bidding, <strong>the</strong> BAC shall conduct a mandatory review and<br />
evaluation <strong>of</strong> <strong>the</strong> terms, conditions, and specifications in <strong>the</strong> Bidding Documents, including<br />
its cost estimates (Section 35.2 <strong>of</strong> <strong>the</strong> revised IRR). Based on its findings, <strong>the</strong> BAC shall<br />
revise <strong>the</strong> terms, conditions, and specifications, and if necessary, adjust <strong>the</strong> ABC, subject<br />
to <strong>the</strong> required approvals, and conduct a re-bidding with re-advertisement and/or posting,<br />
as provided <strong>for</strong> in Section 21.2 (Section 35.3 <strong>of</strong> <strong>the</strong> revised IRR 35.3). All bidders who<br />
have initially responded to <strong>the</strong> REI and have been declared eligible or short listed in <strong>the</strong><br />
previous biddings shall be allowed to submit new bids. The BAC shall observe <strong>the</strong> same<br />
process and set <strong>the</strong> new periods according to <strong>the</strong> same rules followed during <strong>the</strong> previous<br />
bidding (Section 35.4 <strong>of</strong> <strong>the</strong> revised IRR).<br />
Should <strong>the</strong>re occur a second failure <strong>of</strong> bidding, <strong>the</strong> procuring entity may resort to<br />
negotiated <strong>procurement</strong>, as provided <strong>for</strong> in Section 53.1 <strong>of</strong> <strong>the</strong> revised IRR <strong>of</strong> R.A. 9184<br />
(Section 35.5 <strong>of</strong> <strong>the</strong> revised IRR).<br />
The following steps are followed in <strong>the</strong> conduct <strong>of</strong> post-qualification:<br />
a. The BAC, through <strong>the</strong> Secretariat, shall notify <strong>the</strong> consultant with <strong>the</strong> HRB to submit<br />
additional documentary requirements as enumerated in Section 34.2 <strong>of</strong> <strong>the</strong> revised IRR<br />
and Section 3.4 <strong>of</strong> this manual to facilitate with <strong>the</strong> conduct <strong>of</strong> post-qualification. Noncompliance<br />
<strong>of</strong> <strong>the</strong> consultant with <strong>the</strong> HRB shall be ground <strong>for</strong> <strong>the</strong> <strong>for</strong>feiture <strong>of</strong> <strong>the</strong> bid<br />
security tendered and <strong>the</strong> cause <strong>for</strong> disqualification.<br />
b. The BAC/TWG verifies, validates, and ascertains <strong>the</strong> genuineness, validity and accuracy<br />
<strong>of</strong> <strong>the</strong> legal, technical and financial documents submitted by <strong>the</strong> bidder with <strong>the</strong> LCB, using<br />
<strong>the</strong> non-discretionary criteria described above.<br />