KEY FOCUS AREA:<br />

Economic Vibrancy<br />

AGENDA ITEM # 42<br />

AGENDA DATE: February 22, 2012<br />

COUNCIL DISTRICT(S): 2<br />

DEPARTMENT:<br />

Public Works Department<br />

Convention and Event Services<br />

CMO: Jill A. Jordan, P.E., 670-5299<br />

Ryan S. Evans, 670-3314<br />

MAPSCO:<br />

SUBJECT<br />

45P<br />

________________________________________________________________<br />

Authorize Supplemental Agreement No. 4 to the pr<strong>of</strong>essional services contract with<br />

HKS, Inc. for architectural, engineering, interior design, ro<strong>of</strong> inspections, drainage<br />

system video investigation, and construction administration services for the <strong>Dallas</strong><br />

Convention Center Facility Improvement Program - Not to exceed $1,217,060, from<br />

$4,251,551 to $5,468,611 - Financing: 2009 Convention Center Revenue Bonds<br />

BACKGROUND<br />

A pr<strong>of</strong>essional services contract with HKS, Inc. for architectural and engineering design<br />

services was authorized on January 27, 2010, by Resolution No. 10-0328. This<br />

contract has been organized in a manner that will be supplemented to accomplish<br />

multiple projects within the <strong>Dallas</strong> Convention Center Facility Improvement Program.<br />

Projects under this contract which have been authorized to date are the Facility<br />

Assessment, Upper Level D Meeting Rooms, Chilled Water Loop, Building Envelope<br />

Waterpro<strong>of</strong>ing, Fire Alarm and Emergency Lighting Replacement, Area C Concept<br />

Design and Lobby A and A/B Prefunction Area floor replacement and wall treatments.<br />

This action will authorize Supplemental Agreement No. 4 for architectural and<br />

engineering design through construction administrative services for furnishings in the<br />

Prefunction areas <strong>of</strong> A, B, and D; the upgrade <strong>of</strong> finishes for C and D Lobby and<br />

associated restrooms; and the Lower Level C Meeting Rooms, Ballroom C and<br />

Prefunction Area E restrooms in the <strong>Dallas</strong> Convention Center facility. Also, this<br />

supplemental agreement authorizes ro<strong>of</strong> drain and stormwater piping system<br />

investigations and additional ro<strong>of</strong> inspection services for the water infiltration and ro<strong>of</strong><br />

replacement projects. All <strong>of</strong> these projects are included in the <strong>Dallas</strong> Convention Center<br />

Facility Improvement Program. There will be future Council action on this contract as<br />

additional projects are identified to complete the <strong>Dallas</strong> Convention Center Improvement<br />

Program.