14.11.2012 Views

NORTH AND SOUTH AMERICA - CNATRA - The US Navy

NORTH AND SOUTH AMERICA - CNATRA - The US Navy

NORTH AND SOUTH AMERICA - CNATRA - The US Navy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3-30 GUATEMALA<br />

RVSM RULES - Refer to appropriate Regional, FIR/UIR or<br />

National Supplementary Procedures.<br />

(AFFSA/AFFSA FIL 04-656)<br />

FLIGHT PLANNING<br />

1. FLIGHT PLAN ENTRIES - DD Form 1801 or ICAO standard<br />

format. Flight plans must be filed at least 30 minutes prior to<br />

proposed departure time to ensure clearance.<br />

(AFFSA/AFFSA)<br />

NOTE: To prevent misinterpretation of Item 10 in the Flight Plan,<br />

it is emphasized that HF communication equipment is considered<br />

as standard equipment for aircraft planning flight outside VHF<br />

coverage in Sondrestrom FIR. Use of the letter "S" in Item 10 of<br />

the Flight Plan therefore indicates the aircraft is HF as well as VHF<br />

equipped.<br />

(AFFSA/CL II NOTAM)<br />

2. When there is reason to believe that the arrival report will<br />

not reach the appropriate air traffic service unit within 30 minutes<br />

after the estimated time of arrival, notification shall be made in<br />

the flight plan concerning the time when such report may be<br />

expected.<br />

(SPEC/GEN 1.7-3)<br />

3. NOTICE OF VISITING AIRCRAFT (NOVA) MESSAGE -<br />

a. To ensure that details of servicing, maintenance and<br />

personnel requirements are transmitted to airports and bases prior<br />

to the arrival of a nonscheduled flight, the Aircraft Commander<br />

shall send a NOVA message to be dispatched in time to arrive at<br />

the destination as soon as possible for planning purposes.<br />

b. <strong>The</strong> NOVA message should preferably be sent via the<br />

Military Autodin System to Base Operations for Thule AB (BGTL),<br />

but may also be air-filed with appropriate ground stations.<br />

c. <strong>The</strong> NOVA message shall be written in the following<br />

format and contain the following information:<br />

NOVAMSG<br />

(1) Aircraft type, registration number-designated flight<br />

number (if applicable).<br />

(2) Itinerary (date time group UTC-show place by<br />

airport name) e.g.:<br />

Arrive Place Depart<br />

Trenton (CYTN) 141200Z<br />

141700Z Sondrestrom (BGSF) 141800Z<br />

142230Z Thule (BGTL)<br />

(3) Servicing and maintenance required (indicate special<br />

requirements or services not listed in Flight Information<br />

Publications (FLIPs)).<br />

(4) Accommodation requirements (show place, number<br />

of officers, number of enlisted, and other special considerations<br />

such as female crew members or passengers).<br />

(5) Meal/in-flight meal requirements.<br />

(6) Transportation requirements.<br />

(7) Names of officers with rank of colonel and above<br />

(specify deplaning point if passengers not remaining on board for<br />

full itinerary).<br />

(8) Space available for passengers or freight (designate<br />

emplaning airport).<br />

(9) Remarks.<br />

(10) Aircraft Commander's name.<br />

d. A plain language in the NOVA message shall be used.<br />

(AFFSA/AFFSA)<br />

FLIGHT HAZARDS<br />

Pilots are cautioned to be on the alert for adverse effects of<br />

extreme winds and temperature on altimeter readings.<br />

(SPEC/ENR 3.1-7)<br />

ADDITIONAL INFORMATION<br />

1. RESPONSIBILITY FOR AIR TRAFFIC SERVICE - Denmark is<br />

responsible for provision of ICAO Air Traffic Services in the<br />

Sondrestrom FIR. In accordance with <strong>US</strong>AF-DANISH Civil Aviation<br />

Memorandum of Understanding, FAA Air Traffic Control<br />

procedures are applied in the Thule CTA/CTR.<br />

2. Air Force Space Command (AFSPC) is the U.S. Executive<br />

Agent for the Memorandum of Understanding and the focal point<br />

to which U.S. air traffic services matters at Thule (BGTL) should<br />

be addressed. U.S. military users may forward such matters to<br />

HQ AFSPC/DOOH, 150 V<strong>AND</strong>ENBERG STREET, SUITE 1105,<br />

PETERSON AFB, CO 80914-4200.<br />

(AFFSA/AFFSA)<br />

GUATEMALA<br />

NATIONAL PROCEDURES<br />

GENERAL INFORMATION/FIR/UIR<br />

COVERAGE - This entry is inclusive within the Central<br />

American FIR/UIR.<br />

DIMENSIONAL UNITS - ICAO Table except:<br />

1. Air Traffic Control and MET provide altitudes, elevations,<br />

and heights in feet on request.<br />

2. Air Traffic Control provides vertical speed in feet per minute<br />

on request.<br />

ALTIMETER SETTING PROCEDURES - Standard<br />

except:<br />

1. Air Traffic Control will not assign FL200 to any aircraft when<br />

QNH pressure is less than 29.92”.<br />

(SPEC/ENR 1.7-1)<br />

VERTICAL SEPARATION - Semi-circular.<br />

1. According to agreement between Havana ACC (MUHA) and<br />

Central America ACC (MHTG) on route UR630, traffic should use<br />

the following:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!