09.07.2015 Views

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• M<strong>and</strong>la Mthethwa – complained about electricity disruptions• Sifiso - RDP houses in outst<strong>and</strong>ing st<strong>and</strong>s;• The streets next to Th<strong>and</strong>eka school are flooding when it is raining;• In Extension 3 there are old people who do not even get pension, there is a need of people to assist;• A concern about a Thusong centre that is used as a church building was voiced out;• Speed humps next to a Lindilanga school are needed;ISSUES RAISED – WARD 3 (2012)The previous identified issues compiled in the 2012 IDP remainsADDITIONS Establishment of Sporting Centre Building of disable school Gravelling of streets at Mahala Park Building of a Clinic Storm water at Mahala Park <strong>and</strong> Phalama Paving of roads RDP Houses Highlight masts next to the Cemetery <strong>and</strong> Shovovo Sports, Recreational facilicities <strong>and</strong> Multipurpose CentreISSUES RAISED - WARD 4 (2012)ooooooGravelling of roads;Bridge for crossing , TLC;Stormwater drainage in Azalea, Kosmos Street;Gravelling <strong>and</strong> paving of roads in the new established area (Stanwest next to Osman Raydan);Streetlights to be converted into Apolos; <strong>and</strong>Building of RDP houses.ISSUES RAISED – WARD 5 2012Paving of Mfuphi <strong>and</strong> Selepe streetResolving of Phalama <strong>and</strong> M<strong>and</strong>ela Camp informal natureElectricity <strong>and</strong> Toilets in M<strong>and</strong>ela CampRe-gravelling of Streets in PhalamaYouth development initiativeNgubeni street to be pavedRequest for RDP HousesRequest for stormwater drainage systemISSUES RAISED – WARD 6Progress on the past period (2011/2012)• Phase 1 of the Sakhile Hostels is completed;• Three streets have been paved, Shaka, Mokoena <strong>and</strong> Maseko;• The issue of the grazing stock field has been referred to the L<strong>and</strong> Affairs;• The following projects are in progress: St<strong>and</strong>erton L<strong>and</strong>fill Site, Waste Water Treatment plant,upgrading of stormwater networks <strong>and</strong> St<strong>and</strong>erton Sewer Treatment works;• Planning to address the issue of water <strong>and</strong> electricity disruptions by installing new pipes from thereservoir <strong>and</strong> upgrading of electricity substations;102 | P a g e - F i n a l I n t e g r a t e d D e v e l o p m e n t P l a n 2 0 1 3 / 2 0 1 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!