09.07.2015 Views

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“To be the leading, people centered municipality excelling in economic growth, development <strong>and</strong> governance”General information WTP1 WTP2Describe the physical condition Good GoodHow well is the infrastructure maintained? Planned <strong>and</strong> dem<strong>and</strong> Planned <strong>and</strong> dem<strong>and</strong>Are spare parts readily available? Yes YesNumber of breakages / failures per year Never NeverWhat needs to be refurbished? (cost)What needs to be replaced? (cost)Waste Water Treatment WorksPumps - R1,2 millionMeters – R 120 000General information WWTW1 WWTW2<strong>Co</strong>mponent name (No ID) St<strong>and</strong>erton MorgenzonScheme name St<strong>and</strong>erton sewage Morgenzon sewageInstitutional statusCurrent owner & operator <strong>Lekwa</strong> <strong>Lekwa</strong>Future owner / WSA or WSP (If applicable) <strong>Lekwa</strong> <strong>Lekwa</strong>Asset assessmentDate constructed 1904, 1952, 1988 1935 (oxidation ponds only)Expected total lifespan 20 yrs To be upgraded 2002/03Estimated replacement value R35 million R2 millionAnnual operating cost R2 539 880 R557 110Annual maintenance cost R172 370 R8 330Type & capacityType of plant (description) Activated sludge <strong>and</strong> bio-filter Oxidation pondsWater source Effluent EffluentPhysical water quality: Turbidity/chemicalSee quality test results in Appendix EDesign Capacity (Ml) 12 0,5Capacity is still available for development? (%) 42% 0%OperationTotal volume of water treated per year (Ml) 2 555 182Operating hours per day 24 24How often is water quality monitored? Daily <strong>and</strong> weekly 4 times a yearWhat laboratory is used? Own <strong>and</strong> Waterlab Waterlab% Of the time that water is chlorinated 100% 0%% water lost through process eg. Waste water 0% 100%FunctionalityDescribe the physical condition Good PoorHow well is the infrastructure maintained? Planned & on dem<strong>and</strong> InfrequentAre spare parts readily available? (Yes/No) Yes YesNumber of breakages / failures per year Few FewWhat needs to be refurbished? (cost) R50 000 R2 000 000 DM fundsWhat needs to be replaced? (cost) Wornout equipment New rotational biofilter TP89 | P a g e - D r a f t i n t e g r a t e d D e v e l o p m e n t P l a n 2 0 1 3 / 2 0 1 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!