09.07.2015 Views

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“To be the leading, people centered municipality excelling in economic growth, development <strong>and</strong> governance”3.10 WATER & SANITATION SERVICE INFRASTRUCTUREThis section is aimed to describe details of the bulk <strong>and</strong> connector infrastructure in each of the Municipalareas. The schematic layout of water <strong>and</strong> sanitation services for each of the municipalities is summarized inAppendices B to G of the WSDP, highlighting the point of abstraction <strong>and</strong> purification, bulk <strong>and</strong> secondarywater distribution, the zone to which water is supplied <strong>and</strong> return flows to point of discharge.The following sections briefly summarize all pertinent components in the water supply <strong>and</strong> sanitationinfrastructure.Brief functional description of existing main infrastructure componentsThe layout of the water <strong>and</strong> sanitation infrastructure in the different development centers is described in thediagramme in Appendix E of the WSDP. This Section is aimed in describing all pertinent water <strong>and</strong> sanitationinfrastructure in the <strong>Lekwa</strong> municipal area.3.10.1 Existing Groundwater InfrastructureNo information received from any ground water abstraction or water sources in the municipal area.Existing Surface Water InfrastructureGeneral information SW1 SW2 SW3<strong>Co</strong>mponent name (No ID) Grootdraai Dam Vaal River Morgenzon DamScheme name (releases) Direct abstractionInstitutional status (Dam safety register no)12/2/C1<strong>14</strong>-02Current owner & operator DWAF DWAF <strong>Lekwa</strong>Future owner / WSA or WSP (If applicable) DWAF DWAF <strong>Lekwa</strong>Asset assessmentDate constructed 1981 1930Expected total lifespanUsually 40 to 50 years from date of constructionEstimated replacement value No info No info No infoAnnual operating cost No info In O&M budgetAnnual maintenance costNo infoType & capacityCatchment area (km²)Full supply storage capacity (m³) 364 million 0,81 millionType of structure Dam River DamSpillway capacity (m³/sec) / type Ogee N/aTotal annual assured yield (m³/annum) No info No infoCan the dam capacity be increased? (Yes/No) No info No infoCapacity is available for development? (%)Dam/river under stressOperationDam safety registration (Yes/No) Yes N/a No% Allocation for domestic consumption 30 Ml/day ??% Of domestic allocation used 60%87 | P a g e - D r a f t i n t e g r a t e d D e v e l o p m e n t P l a n 2 0 1 3 / 2 0 1 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!