09.07.2015 Views

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“To be the leading, people centered municipality excelling in economic growth, development <strong>and</strong> governance”General information SW1 SW2 SW3Is the abstraction registered with DWAF? (Yes/No) Yes Yes YesWhen was the last dam safety inspection? (Date) 1989 N/a No infoWhen was the last water restriction? (Date) 1985 1985How many water restrictions in the last 5 years? None NoneFunctionalityHow well is the infrastructure maintained? Regularly PlannedAre spare parts readily available? (Yes/No) Yes Yes YesNumber of breakages / failures per year 0 0 0Describe the physical condition Good GoodWhat needs to be refurbished ? (cost) DWAF’s resp UncertainWhat needs to be replaced ? (cost) DWAF’s resp Uncertain3.10.2 Existing Water Treatment (WTP) <strong>and</strong> Wastewater Treatment Works (WWTW)InfrastructureInformation on the WTPs <strong>and</strong> WWTP’’s at St<strong>and</strong>erton <strong>and</strong> Morgenzon are included in the following tables.Water Treatment PlantsGeneral information WTP1 WTP2<strong>Co</strong>mponent name (No ID) St<strong>and</strong>erton WTP Morgenzon WTPScheme name Water supply Water supplyInstitutional statusCurrent owner & operator<strong>Lekwa</strong>Future owner / WSA or WSP (If applicable)<strong>Lekwa</strong>Asset assessmentDate constructed 1908 1998Expected total lifespan 20 yrs 50 yrsEstimated replacement value R20 million R6 millionAnnual operating cost R3,4 million + 0,75 m electr R 0,7 mAnnual maintenance cost R188 000 R42 000Type & capacityType of plant (description) S<strong>and</strong> Filter S<strong>and</strong> FilterWater source (purchased, ground, surface) Surface SurfacePhysical water quality: Turbidity 11 – 280 NTU 11 – 280 NTUChemical causing quality problem (>10 mg/l)See quality reports in Appendix EDesign Capacity (Ml) 27 1,8Capacity is still available for development? (%) 35% 62%OperationTotal volume of water treated per year (Ml) 6205 255Operating hours per day 11 – 13 10How often is water quality monitored? Daily DailyWhat laboratory is used? Waterlab <strong>and</strong> own facility Waterlab <strong>and</strong> own facility% Of the time that water is chlorinated 100% 100%% Of water lost through process eg. Waste water 220 kl/day 50 kl/dayFunctionality88 | P a g e - D r a f t i n t e g r a t e d D e v e l o p m e n t P l a n 2 0 1 3 / 2 0 1 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!