09.07.2015 Views

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

Lekwa Local Municipality 2013/14 - Co-operative Governance and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General information Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10Describe the physical condition Good Good Fair Fair Good Good Fair Good Good GoodHow well is the infrastructure Dem<strong>and</strong>maintained?planned<strong>and</strong> Dem<strong>and</strong>planned<strong>and</strong>Dem<strong>and</strong>planned<strong>and</strong>Dem<strong>and</strong> <strong>and</strong> Dem<strong>and</strong> <strong>and</strong> Dem<strong>and</strong>Dem<strong>and</strong> <strong>and</strong> planned Dem<strong>and</strong> <strong>and</strong> planned Dem<strong>and</strong> <strong>and</strong> plannedplannedplanned plannedAre spare parts readilyYes Yes Yes Yes Yes Yes Yes Yes Yesavailable?Number of breakages / failures0,05 0,05 1/aWhat needs to be refurbished?(cost)What needs to be replaced?R700 000 R400 000 R400 000(cost)Replace Steel with PVC<strong>and</strong>Replacement <strong>and</strong> new installations include meters <strong>and</strong> PRV installations3.10.6 Existing Reservoir InfrastructureGeneral information RES 1 RES 2 RES 3 RES 4 RES 5 RES 6 RES 7 RES 8 RES 9<strong>Co</strong>mponent name (No ID)<strong>Co</strong>ncor Reservoir <strong>Co</strong>ncor Tower New St<strong>and</strong>erskop 1 New St<strong>and</strong>erskop 2 Old St<strong>and</strong>erskop Kieser Street Square Kieser Street Round MorgenzonReservoirScheme name St<strong>and</strong>erton water supply Morgenzon water supplyInstitutional statusCurrent owner & operatorFuture owner / WSA or WSPAsset assessment<strong>Lekwa</strong><strong>Lekwa</strong>Date constructed 1984 1984 1978 1978 1950 1908 1940 1998 1950Expected total lifespan 20 yrs 20 yrs 20 yrs 20 yrs 20 yrs 20 yrs 20 yrs 20 yrsMorgenzonTowerEstimated replacement value R6 million R1,8 million R6 million R6 million R6 million R1,6 million R1,6 million R3 million R1,8 millionAnnual operating costAnnual maintenance costType & capacityIncluded in the water treatment costsIncluded in the annual maintenance costsReservoir elevated or ground Ground Elevated Ground Ground Ground Ground Ground Ground ElevatedType of material <strong>Co</strong>ncrete <strong>Co</strong>ncrete <strong>Co</strong>ncrete <strong>Co</strong>ncrete <strong>Co</strong>ncrete <strong>Co</strong>ncrete <strong>Co</strong>ncrete <strong>and</strong> steelReservoir capacity (Ml) 10 0,15 10 10l 9 1,46 1,55 5 1,5Bulk or reticulation reservoir? Reticulation Reticulation Reticulation Reticulation Reticulation Reticulation Reticulation Reticulation ReticulationCapacity available for development 53,7% 93% 29,72% 29,72% 45,62% 20,6% 25%94 | P a g e - F i n a l I n t e g r a t e d D e v e l o p m e n t P l a n 2 0 1 3 / 2 0 1 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!