EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:GENEVA ELEMENTARY275 1ST STREET, GENEVACapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use ELEMENTARY ELEMENTARYLow Grade KINDERGARTEN PRE-K E S EHigh Grade GRADE 5 GRADE 5CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 606 -40 566Reloc. Stations 66 -66 0Mod. Stations 0 0 0Total Stations 672 -106 566Utilization Factor 100% 100%School Capacity 672 566COFTE StudentMembershipSurvey An<strong>not</strong>ation518 505OTHER: Add new fence along NE property l<strong>in</strong>e. Improve <strong>in</strong>ternal traffic flow & site access.Upgrade the electrical distribution system and all associated switchgear, sub-panels &equipment. Update 5 handicap ramps, <strong>in</strong>clud<strong>in</strong>g car ramp area.The recommendation to remodel Build<strong>in</strong>g 11 is to br<strong>in</strong>g <strong>up</strong> to FBC and SREF is required byDOE before a Castaldi analysis can be submitted and reviewed. Build<strong>in</strong>g 11 is two dist<strong>in</strong>ctbuild<strong>in</strong>gs and the recommendation is to replace the spaces <strong>in</strong> Build<strong>in</strong>g 11 that have beenselected under the remodel category with badly needed ESE spaces. The other roomsassociated with Build<strong>in</strong>g 11 are be<strong>in</strong>g renovated. The remodeled portion of Build<strong>in</strong>g 11 is theonly portion that would be submitted for a Castaldi analysis. If DOE concurs with the Castaldianalysis that it is more cost effective to replace than to rehabilitate that portion of the build<strong>in</strong>g,then a survey amendment will be submitted to remodel this portion of the build<strong>in</strong>g out &replace with newly constructed ESE spaces.Remodel<strong>in</strong>g recommendation for Build<strong>in</strong>g 9 is to br<strong>in</strong>g <strong>up</strong> to FBC and SREF as required byDOE before a Castaldi analysis can be submitted and reviewed. If DOE concurs with theCastaldi analysis that it is more cost effective to replace than to rehabilitate that portion of thebuild<strong>in</strong>g, then a survey amendment will be submitted to remodel this portion of the build<strong>in</strong>gout to provide space for possible new construction.PAGE:123 of 401Report Date: 5/12/2011 3:38:08 PMPage 210

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!