12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:GREENWOOD LAKES MIDDLE601 LAKE PARK DRIVE, LAKE MARYCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use MIDDLE MIDDLELow Grade GRADE 6 GRADE 6High Grade GRADE 8 GRADE 8CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 1,319 -54 1265Reloc. Stations 22 -22 0Mod. Stations 88 0 88Total Stations 1,429 -76 1353Utilization Factor 90% 90%School Capacity 1,286 1217COFTE StudentMembershipSurvey An<strong>not</strong>ation1,030 1,097OTHER: Upgrade all exterior light<strong>in</strong>g. Provide lightn<strong>in</strong>g protection system as neededthroughout the campus (covered pavilion) and park<strong>in</strong>g lot lights. Add two poles & lights toeast park<strong>in</strong>g lot.REMODEL OF BUILDING 7: Recommendation is to br<strong>in</strong>g cafeteria/d<strong>in</strong><strong>in</strong>g/serv<strong>in</strong>g area <strong>up</strong> tocurrent district standards.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $1,200 $363,500 $1,667,560 $10,683,220 $0Estimated Total Project Cost $12,715,480NewConstructionCostPAGE:134 of 401Report Date: 5/12/2011 3:38:08 PMPage 221

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!