12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:WINTER SPRINGS ELEMENTARY701 W STATE ROAD 434, WINTER SPRINGSCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use ELEMENTARY ELEMENTARYLow Grade KINDERGARTEN PRE-K E S EHigh Grade GRADE 5 GRADE 5CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 721 -13 708Reloc. Stations 0 0 0Mod. Stations 0 0 0Total Stations 721 -13 708Utilization Factor 100% 100%School Capacity 721 708COFTE StudentMembershipSurvey An<strong>not</strong>ation494 559OTHER: Add fenc<strong>in</strong>g to campus. Stormwater manhole is <strong>in</strong> path to only handicap automaticdoorway. Remove manhole out of sidewalk and construct new one out of sidewalk; construct15' wide area sidewalk. Stablize access road around campus. Remove old handicap ramps &construct five new ones. Add 6 ft of pavement to exit driveway. Add sod to bare soil area <strong>in</strong>playground area.REMODELING OF BLDG 7: Remodel cafeteria & kitchen to current district standards.NEW CONSTRUCTION: Recommended new construction is an addition to Build<strong>in</strong>g 8 -Covered P.E. area to provide P.E. Storage, teacher plann<strong>in</strong>g office, staff toilet, & studenttoilets adjacent to play area.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $123,000 $173,000 $678,690 $1,204,140 $102,030Estimated Total Project Cost $2,280,860NewConstructionCostPAGE:376 of 401Report Date: 5/12/2011 3:38:08 PMPage 463

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!