12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:WOODLANDS ELEMENTARY1420 E E WILLIAMSON ROAD, LONGWOODCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use ELEMENTARY ELEMENTARYLow Grade KINDERGARTEN PRE-K E S EHigh Grade GRADE 5 GRADE 5CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 720 -8 712Reloc. Stations 0 0 0Mod. Stations 132 0 132Total Stations 852 -8 844Utilization Factor 100% 100%School Capacity 852 844COFTE StudentMembershipSurvey An<strong>not</strong>ation748 732OTHER: Grade & sod various areas throughout the campus to prevent erosion. Update sixhandicap ramps. Add a handicap ramp at the bus drop off area. The area currently has nohandicap ramps. Add 1 fire hydrant & 320 feet of pipe. Add fenc<strong>in</strong>g for campus security.Exterior light<strong>in</strong>g is poor. Add wall packs for wall build<strong>in</strong>gs.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $8,100 $148,460 $197,640 $6,986,700 $0Estimated Total Project Cost $7,340,900NewConstructionCostPAGE:382 of 401Report Date: 5/12/2011 3:38:08 PMPage 469

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!