12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:WILSON ELEMENTARY985 ORANGE BOULEVARD, SANFORDCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use ELEMENTARY ELEMENTARYLow Grade KINDERGARTEN PRE-K E S EHigh Grade GRADE 5 GRADE 5CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 828 -34 794Reloc. Stations 0 0 0Mod. Stations 144 0 144Total Stations 972 -34 938Utilization Factor 100% 100%School Capacity 972 938COFTE StudentMembershipSurvey An<strong>not</strong>ation938 918OTHER: Remove & construct 7 handicap ramps. Add sidewalks throughout campus toprevent erosion and for student access. Construct concrete flume lead<strong>in</strong>g <strong>in</strong>to retentionpond. Add pipe under sidewalk between Build<strong>in</strong>gs 4 & 5. Grade area between build<strong>in</strong>gs.Add pipes under sidewalks <strong>in</strong> <strong>in</strong>terior courtyard to facilitate positive dra<strong>in</strong>age. Install gutters &roof dra<strong>in</strong>s to prevent sidewalk deterioration. Grade & sod fields. Sod bare soil areas.Upgrade all orig<strong>in</strong>al electrical switchgear & associated distribution equipment for the entirecampus. Sod & irrigate playground.The recommendation to remodel Build<strong>in</strong>gs 1 & 9 to br<strong>in</strong>g <strong>up</strong> to FBC and SREF is required byDOE before a Castaldi analysis can be submitted and reviewed. If DOE concurs with theCastaldi analysis that it is more cost effective to replace than to rehabilitate these build<strong>in</strong>gs,then a survey amendment will be submitted to remodel these build<strong>in</strong>gs out & replace withnew construction.NEW CONSTRUCTION: Recommended new construction is an addition to Build<strong>in</strong>g 7 -Covered P.E. area to provide P.E. Storage, teacher plann<strong>in</strong>g office, staff toilet & studenttoilets adjacent to play areaPAGE:370 of 401Report Date: 5/12/2011 3:38:08 PMPage 457

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!