12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:MILLENNIUM MIDDLE100 LAKEVIEW DRIVE, SANFORDCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use MIDDLE MIDDLELow Grade GRADE 6 GRADE 6High Grade GRADE 8 GRADE 8CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 1,766 0 1766Reloc. Stations 330 -330 0Mod. Stations 0 0 0Total Stations 2,096 -330 1766Utilization Factor 90% 90%School Capacity 1,886 1589COFTE StudentMembershipSurvey An<strong>not</strong>ation1,630 1,584OTHER: Add four concrete flumes around the exist<strong>in</strong>g pond <strong>in</strong>side the bus loop. Sod areathat is currently mulch. Add 25 splash pads on the south side of bldg 5. Side slopes onexist<strong>in</strong>g retention pond are erod<strong>in</strong>g. Add geotextile material for slope stablization and resod.Add truncated domes to four handicap ramps. Add landscape shrubs to grass area to preventerosion. New fenc<strong>in</strong>g. Grade & sod PE field. Upgrade exterior light<strong>in</strong>g throughout thecampus.NEW CONSTRUCTION: Recommendation for new construction is to expand the exist<strong>in</strong>gkitchen/d<strong>in</strong><strong>in</strong>g area to accommodate current kitchen standards. Subsequently, there will bemore spaces recommended than allowed by the facilities list because square footage is be<strong>in</strong>gadded under new construction and the spaces are also recommended under remodel<strong>in</strong>g.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $115,000 $667,600 $1,903,970 $11,872,008 $1,593,614Estimated Total Project Cost $16,152,192NewConstructionCostPAGE:264 of 401Report Date: 5/12/2011 3:38:08 PMPage 351

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!