12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:JACKSON HEIGHTS MIDDLE141 ACADEMY AVENUE, OVIEDOCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use MIDDLE MIDDLELow Grade GRADE 6 GRADE 6High Grade GRADE 8 GRADE 8CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 1,620 -59 1561Reloc. Stations 0 0 0Mod. Stations 0 0 0Total Stations 1,620 -59 1561Utilization Factor 90% 90%School Capacity 1,458 1404COFTE StudentMembershipSurvey An<strong>not</strong>ation1,265 1,221OTHER: Ra<strong>in</strong>water & foot traffic have eroded areas adjacent to sidewalks around campus.Areas need to be regraded & sodded to prevent sidewalk failure & trip hazard. Extend roofdra<strong>in</strong>s 10' to prevent erosion around sidewalks & paved areas. Update handicap ramps.Need a 6' sidewalk around the back of Build<strong>in</strong>g 5 for fire escape doors. No sidewalks exist<strong>in</strong>gat this time. Regrade & sod playfield area. It ponds water & is develop<strong>in</strong>g holes from <strong>in</strong>tenseuse.The recommendation to remodel Build<strong>in</strong>g 5 to br<strong>in</strong>g <strong>up</strong> to FBC and SREF is required by DOEbefore a Castaldi analysis can be submitted and reviewed. If DOE concurs with the Castaldianalysis that it is more cost effective to replace than to rehabilitate the build<strong>in</strong>g, then a surveyamendment will be submitted to remodel this build<strong>in</strong>g out & replace with new construction.NEW CONSTRUCTION: Recommendation to expand kitchen area (Bldg 4) to accommodatecurrent middle school standard kitchen.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $0 $134,000 $5,881,862 $5,568,468 $186,065Estimated Total Project Cost $11,770,395NewConstructionCostPAGE:175 of 401Report Date: 5/12/2011 3:38:08 PMPage 262

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!