12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:LAKE BRANTLEY SENIOR HIGH991 SAND LAKE ROAD, ALTAMONTE SPRINGSCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use SENIOR HIGH SENIOR HIGHLow Grade GRADE 9 GRADE 9High Grade GRADE 12 GRADE 12CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 2,806 6 2812Reloc. Stations 150 -150 0Mod. Stations 200 0 200Total Stations 3,156 -144 3012Utilization Factor 95% 95%School Capacity 2,998 2861COFTE StudentMembershipSurvey An<strong>not</strong>ation2,907 2,753OTHER: There are 12 handicap ramps that do <strong>not</strong> meet current standards. Upgrade tocurrent standards. Provide handicap access as needed throughout campus. Bldg 6: A gateneeds to be added on the road from the west entrance <strong>in</strong>to the pool/locker room area forsecurity reasons. At this time there is no way to limit access to this area when needed. Thelocation would be along the north side of Bldg. 6. Add park<strong>in</strong>g lot light<strong>in</strong>g as neededthroughout campus. Bldg 1: Open area between Build<strong>in</strong>g 1 & 2 has <strong>in</strong>adequate light<strong>in</strong>g.Install 4 wall mounted lights.The recommendation to remodel Build<strong>in</strong>gs 3, 4, & 5 to br<strong>in</strong>g <strong>up</strong> to FBC and SREF is requiredby DOE before a Castaldi analysis can be submitted and reviewed. If DOE concurs with theCastaldi analysis that it is more cost effective to replace than to rehabilitate the build<strong>in</strong>gs,then a survey amendment will be submitted to remodel these build<strong>in</strong>gs out & replace withnew construction.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $222,000 $330,000 $8,290,366 $23,356,373 $0Estimated Total Project Cost $32,198,739NewConstructionCostPAGE:191 of 401Report Date: 5/12/2011 3:38:08 PMPage 278

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!