12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:SOUTH SEMINOLE MIDDLE101 S WINTER PARK DRIVE, CASSELBERRYCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use MIDDLE MIDDLELow Grade GRADE 6 GRADE 6High Grade GRADE 8 GRADE 8CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 1,366 0 1366Reloc. Stations 0 0 0Mod. Stations 0 0 0Total Stations 1,366 0 1366Utilization Factor 90% 90%School Capacity 1,229 1229COFTE StudentMembershipSurvey An<strong>not</strong>ation1,154 1,114OTHER: M<strong>in</strong>or erosion around retention pond. Add erosion protection around 6 MES's.Update four handicap ramps. Add fenc<strong>in</strong>g at concrete entrance (sidewalk). Grade P.E. fieldsto elim<strong>in</strong>ate erosion/flood<strong>in</strong>g.The recommendation to remodel Build<strong>in</strong>gs 1 & 7 to br<strong>in</strong>g <strong>up</strong> to FBC and SREF is required byDOE before a Castaldi analysis can be submitted and reviewed. If DOE concurs with theCastaldi analysis that it is more cost effective to replace than to rehabilitate the build<strong>in</strong>gs,then a survey amendment will be submitted to remodel these build<strong>in</strong>gs out & replace withnew construction.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $0 $137,000 $1,225,854 $1,340,130 $0Estimated Total Project Cost $2,702,984NewConstructionCostPAGE:329 of 401Report Date: 5/12/2011 3:38:08 PMPage 416

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!