12.07.2015 Views

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

Back-up not in agenda book - Seminole County Schools

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORTDistrict:59-SEMINOLE COUNTY SCHOOL DISTRICTSurvey:Survey: 3 - Version: 1Status:Active Pend<strong>in</strong>gDistrict Name:SEMINOLE COUNTY SCHOOL DISTRICTSurvey: Number 3 - Version 1Facility Name:Address:LAKE ORIENTA ELEMENTARY612 NEWPORT AVENUE, ALTAMONTE SPRINGSCapital OutlayClassificationExist<strong>in</strong>g1 - SCHOOL RECOMMENDED FORCONTINUED USERecommended1 - SCHOOL RECOMMENDED FORCONTINUED USEFacility Use ELEMENTARY ELEMENTARYLow Grade KINDERGARTEN PRE-K E S EHigh Grade GRADE 5 GRADE 5CommentsExist<strong>in</strong>gStudent StationsAdded/Reduced(+ or -)RecommendedPerm. Stations 891 -46 845Reloc. Stations 0 0 0Mod. Stations 0 0 0Total Stations 891 -46 845Utilization Factor 100% 100%School Capacity 891 845COFTE StudentMembershipSurvey An<strong>not</strong>ation610 589OTHER: Recommend widen<strong>in</strong>g exist<strong>in</strong>g sidewalk to prevent erosion. Upgrade 4 handicapramps. Add two fire hydrants & associated water ma<strong>in</strong>. Grade & sod PE field near basketballcourts to prevent erosion. Upgrade all exterior light<strong>in</strong>g throughout campus, <strong>in</strong>clud<strong>in</strong>g park<strong>in</strong>glot.REMODELED BUILDING 7 - Remodel <strong>in</strong>to current spaces as they exist but br<strong>in</strong>gkitchen/serv<strong>in</strong>g & d<strong>in</strong><strong>in</strong>g <strong>up</strong> to current standards. Re-configure spaces to enlargekitchen/serv<strong>in</strong>g, etc.NEW CONSTRUCTION: Recommended new construction is an addition to Build<strong>in</strong>g 9 -Covered P.E. area to provide P.E. Storage, teacher plann<strong>in</strong>g office, staff toilet & studenttoilets adjacent to play area.New Site CostSiteExpansionSiteDevelopmentSiteImprovementRemodel<strong>in</strong>gCostRenovationCost$0 $0 $0 $421,000 $1,125,900 $4,234,140 $0Estimated Total Project Cost $5,781,040NewConstructionCostPAGE:229 of 401Report Date: 5/12/2011 3:38:08 PMPage 316

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!