16.04.2015 Views

MULTI TYPE

MULTI TYPE

MULTI TYPE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7 TEST OPERATION<br />

7-1. Procedure and Summary of Test Operation<br />

A test operation is executed with the following procedure. When problems or an error occurs at any step, remove<br />

the causes of the problem or error referring to “8 TROUBLESHOOTING.”<br />

Checks before test operation<br />

Check basic items, mainly the installation work.<br />

Be sure to enter the check results in checklist 1 and 2.<br />

Check that the main<br />

power supply is turned<br />

on.<br />

This check is done after the power has been turned on.<br />

Check that the refrigerant circuit system is turned on normally.<br />

Set up the addresses.<br />

Start the address setup in the outdoor/indoor units.<br />

Note: Operation does not start simply by powering-on.<br />

Test operation<br />

Carry out a test operation. Check air blowing and<br />

cooling/heating operation in the indoor unit.<br />

END<br />

118

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!