16.04.2015 Views

MULTI TYPE

MULTI TYPE

MULTI TYPE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No. Part to be replaced Work procedure Remarks<br />

9 4-way valve<br />

- detachment/<br />

attachment<br />

MAP0804<br />

MAP1004<br />

MAP1204<br />

WARNING<br />

Wear a pair of gloves.<br />

Otherwise, you will risk an injury involving a<br />

replacement part or some other object.<br />

4) Brazed point<br />

PMV<br />

Before starting the work, be sure to recover the<br />

refrigerant of outdoor unit by removing it with a<br />

refrigerant recovery device.<br />

1. Detachment<br />

1)Remove the lower cabinet (front side).<br />

2)Remove the inverter box in accordance with the<br />

dismantling instructions.<br />

3)Disconnect the 4-way valve coil and PMV coils (2<br />

pieces) and get all wiring located near the 4-way<br />

valve out of the way.<br />

4)Remove brazed points (2 locations) for the PMV<br />

assembly, which is placed in front of the 4-way<br />

valve.<br />

* Provide adequate cover for the PMV to protect it<br />

from overheating.<br />

5)Since it is difficult to simultaneously remove the<br />

brazed points for the pipes located above the 4-<br />

way valve (3 pieces), cut through them just below<br />

the brazed points using a saw, etc.<br />

6)Detach the pipe located below the 4-way valve.<br />

7)Remove the end sections of the pipes above the<br />

4-way valve, which were cut in step 5).<br />

8)Install a new 4-way valve.<br />

* Provide adequate cover for the 4-way valve to<br />

protect it from overheating. During the installation,<br />

insert pipes firmly into the 4-way valve, or a<br />

blockage or leakage involving brazing filler metal<br />

may result.<br />

9)Reinstall the PMV assembly, which was removed<br />

in step 4).<br />

* Provide adequate cover for the PMV to protect it<br />

from overheating.<br />

10) Reinstall all the coils removed in step 3), and put<br />

the wiring back to its initial state.<br />

11) Reinstall the inverter box in accordance with the<br />

installation instructions.<br />

12) Reinstall the lower cabinet.<br />

7) End sections of pipes (3 pieces)<br />

4-way valve<br />

6) Brazed point<br />

4) Brazed point<br />

5) Cutting<br />

line<br />

Removing of brazed point on<br />

left side of strainer (1 location)<br />

4-way valve<br />

proper<br />

Cutting through of<br />

pipes located above<br />

4-way valve (3 pieces)<br />

Removing of brazed point at<br />

back of PMV (1 location)<br />

Removing of brazed point<br />

for pipe located below<br />

4-way valve (1 location)<br />

PMV assembly<br />

Before Removal of PMV Assembly<br />

After Removal of PMV Assembly<br />

274

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!