16.04.2015 Views

MULTI TYPE

MULTI TYPE

MULTI TYPE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No. Part to be replaced Work procedure Remarks<br />

5 Reactor assembly<br />

WARNING<br />

Wear a pair of gloves.<br />

Otherwise, you will risk an injury involving a<br />

replacement part or some other object.<br />

• 14, 16HP case<br />

3) Screw<br />

Fixing claw (slide stopper to right)<br />

1. Detachment<br />

1)Stop the operation, and turn off the circuit breaker.<br />

2)Remove the inverter assembly.<br />

(See the inverter assembly dismantling method<br />

under item 4.)<br />

3)<br />

Screw<br />

3)With a 14, 16HP unit, remove the separately<br />

mounted reactor box.<br />

To remove the reactor box, remove the screws<br />

at the top and bottom (M5 × 10) and unlock the<br />

box by sliding the stopper to the right.<br />

* Before pulling the reactor box, tilt it back to free<br />

the bottom.<br />

4)Remove the reactor box located at the back of the<br />

inverter assembly.<br />

(M4 × 6, 4 pcs.)<br />

* The screws can be removed from the front.<br />

Fixing claw (slide stopper to right)<br />

4) Screws (2 locations)<br />

With a 14, 16HP unit, remove the separately<br />

mounted anchor plate.<br />

(M4 × 6, 4 pcs.)<br />

5)Remove and replace the reactor.<br />

(M4 × 6, 1 pc.)<br />

4) Screws (2 locations)<br />

• 8, 10, 12HP case<br />

[<br />

4) Screws (2 locations)<br />

4) Screws (2 locations)<br />

268

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!