Checklist 1<br />

• Using Checklist 1, check that there are no problems with the installation work.<br />

Is the capacity of the<br />

circuit breaker (Earth<br />

leakage breaker)<br />

appropriate?<br />

Is the gauge of the<br />

power cable correct?<br />

Outdoor total capacity A Header unit (A) A Indoor unit A<br />

Follower unit (B) A<br />

Follower unit (C) A<br />

Follower unit (D) A<br />

Header unit (A) mm 2 Indoor unit mm 2<br />

Follower unit (B) mm 2<br />

Follower unit (C) mm 2<br />

Follower unit (D) mm 2<br />

Is the control<br />

Indoor-outdoor connection terminals (U1, U2)<br />

communication line<br />

Outdoor-outdoor connection terminals (U5, U6)<br />

correct?<br />

Central control system connection terminals (U3, U4)<br />

Is the power of indoor units supplied collectively?<br />

Is it grounded to earth?<br />

Is the resistance sufficient? (10 M or higher) M or higher<br />

Is the main power voltage sufficient? (within 380-415 V ±10%) V<br />

Is the diameter of connecting pipe correct?<br />

Is the branch kit correct?<br />

Is the water drain of the indoor unit arranged so that it flows without accumulation?<br />

Is the heat insulation of pipes sufficient? (connecting pipes, branch kit)<br />

Is there no short circuit of discharge air in the indoor/outdoor units?<br />

After an airtightness test of the pipes, are vacuuming and adding of refrigerant executed?<br />

Are the valves of all the outdoor units fully opened?<br />

Gas side Liquid side Balance side<br />

Header unit (A)<br />

Follower unit (B)<br />

Follower unit (C)<br />

Follower unit (D)<br />

121

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!