16.04.2015 Views

MULTI TYPE

MULTI TYPE

MULTI TYPE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(2) In the case that a central control system is connected (before address setup)<br />

Central remote controller<br />

(1) (4) (2)(5) (3)<br />

U1<br />

U3<br />

U2<br />

U4<br />

To other refrigerant line<br />

Other<br />

refrigerant line<br />

U3<br />

U4<br />

Header unit (A) Follower unit (B) Follower unit (C)<br />

U3 U4<br />

U3 U4<br />

U3 U4<br />

Outdoor unit<br />

U1 U2 U5 U6<br />

U1<br />

U2<br />

U5<br />

U6<br />

U1 U2 U5 U6<br />

U1 U2 U5 U6<br />

To indoor unit<br />

(7) (6)<br />

Indoor unit<br />

U1 U2 U1 U2 U1 U2 U1 U2<br />

A B A B A B A B<br />

Remote<br />

controller<br />

Remote<br />

controller<br />

Remote<br />

controller<br />

Main check items<br />

(1)Are the indoor and outdoor communication lines of the header unit connected to the U1/U2 terminals?<br />

(2)Is the relay connector between the U1/U2 terminal and the U3/U4 terminal removed? (Set up at<br />

shipment from the factory)<br />

(Keep the relay connector disconnected before address setup.)<br />

(3)Is the communication line between outdoor units connected to the U5/U6 terminal?<br />

(4)Is the communication line of the central control system connected to the header unit U3/U4 terminals<br />

of each refrigerant line?<br />

(The communication line of the central control system may be connected to the communication lines<br />

of the indoor/outdoor communication lines.)<br />

(5)Is the terminal resistance (SW30-bit 2) on the interface PC board of the header unit turned on? (Set<br />

up at shipment from the factory)<br />

* After address setup and test operation check, turn on the SW30-bit 2 of the header unit for the<br />

smallest line address, and turn off SW30-bit 2 of the header unit for other refrigerant lines. (See<br />

page 125, “7-4-3. Address Setup Procedure”)<br />

(6)Is the end terminal of the shield wire open?<br />

(7)Is the end terminal of the shield wire earthed at the header unit side?<br />

(8)When the refrigerant line and the central control system of the DI-SDI series are connected:<br />

➝ Are Network adapter (TCB-PCNT30TLE2) correctly connected?<br />

➝ When the DI-SDI series operates with group, twin, or triple operation, are the adapters connected<br />

to the header unit of the indoor unit?<br />

Check<br />

NOTE<br />

The figure above does not show all the electric wires.<br />

For details, refer to the installation manuals for the outdoor unit, indoor unit, remote controller, or optional devices.<br />

120

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!