10.07.2015 Views

Order 7110.65P, Air Traffic Control, with changes

Order 7110.65P, Air Traffic Control, with changes

Order 7110.65P, Air Traffic Control, with changes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>7110.65P</strong>2/19/04c. A crossing runway if projected flight paths willcross. (See FIG 6−1−3.)FIG 6−1−3Arrival MinimaLanding Behind an Arriving Heavy Jet/B7576−1−2General

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!