10.07.2015 Views

Order 7110.65P, Air Traffic Control, with changes

Order 7110.65P, Air Traffic Control, with changes

Order 7110.65P, Air Traffic Control, with changes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pilot/<strong>Control</strong>ler Glossary 8/5/04OVERLYING CENTER− The ARTCC facility thatis responsible for arrival/departure operations at aspecific terminal.PCG O−4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!