10.07.2015 Views

Order 7110.65P, Air Traffic Control, with changes

Order 7110.65P, Air Traffic Control, with changes

Order 7110.65P, Air Traffic Control, with changes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>7110.65P</strong> 2/19/0413−2−5. COORDINATIONIn addition to the requirements set forth in Chapter 8,Offshore/Oceanic Procedures, Section 2, Coordination,automated coordination shall constitute completecoordination between Ocean21 sectors, bothinternally and between sectors across adjacentOcean21 facilities, except:a. When the aircraft is in conflict <strong>with</strong> another inthe receiving sector, orb. When otherwise specified in facility directivesor LOA.13−2−6. TEAM RESPONSIBILITIES − MULTIPLEPERSON OPERATIONa. When operating in a multiple controlleroperation at a workstation, ensure all ATC tasks arecompleted according to their priority of duties.b. Multiple controller operation shall be accomplishedaccording to facility directives.13−2−4Ocean21 − Oceanic

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!