The operational flexibility of SINUS has enabled the introduction of automatic validation tools<br />

for validating FCPs.<br />

Up until SPOT5 (SPOT1-2-3-4 satellites), the BSSO was the sole simulator used for operational<br />

validation. SINUS was used to validate the AOCS and payload fine programming loop.<br />

For SPOT5, a decision was taken to use both simulators in a complementary capacity during the<br />

satellite qualification phases (QT, QO).<br />

This use of both simulators significantly reduced the duration of qualification phases.<br />

5. Operability testing<br />

Operability tests are executed with the same facilities as those used during satellite operations (the<br />

main difference is that the satellite is replaced by a simulator, either SINUS or the BSSO) ;<br />

operational modes are also reproduced :<br />

• The simulator works in its real time mode and is connected to the ground control center (CCS).<br />

• Operability tests aim at validating Flight Control Procedures together with the use of ground<br />

control facilities (CCS) : TC are sent from CCS and TM parameters are displayed on CCS<br />

mimics.<br />

• With respect to SPOT/HELIOS satellites, procedure execution is manual : FCPs are read and<br />

executed step by step by the operator. TC to be sent to the satellite simulator are selected<br />

manually. Specified TM effects are checked also manually using TM mimics.<br />

Operability testing is part of system testing. These tests involve a large team including experts in<br />

the following fields : command/control, on-board software, ground-segment, simulator, quality<br />

insurance …<br />

TM mimics<br />

GUI to send TC<br />

Satellite Ground Center (CCS)<br />

Control Plan<br />

TC (procedures)<br />

to send are read<br />

TM param<br />

To check are read<br />

TM<br />

5<br />

TC<br />

Simulator<br />

(SINUS or BSSO)<br />

Or Satellite