12.03.2014 Views

Volume-IF - JantERmantER

Volume-IF - JantERmantER

Volume-IF - JantERmantER

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCPL-K4A02<br />

2.5.1 General<br />

All materials required for the work shall be of best commercial variety and<br />

as approved by the Engineer.<br />

2.5.2 Borrow Material<br />

Borrow material required for area filling shall be excavated from approved<br />

locations and levels, and shall consist of selected material, approved by<br />

the Engineer, free from roots, vegetations, decayed organic matter, harmful<br />

salts and chemicals, free from lumps and clods. Clean graded sand,<br />

free from harmful and deleterious materials from approved quarries, shall be<br />

used as fill material at places approved during detail engineering stage.<br />

Necessary arrangement shall be done by the Contractor at his own cost for<br />

locating and using the borrow areas as the source of supply of filling<br />

material.<br />

The depth of borrow pits should be so regulated that the borrow pits do<br />

not cut an imaginary line having a slope of 1 vertical in 4 horizontal projected<br />

from the edge of final section of the adjacent embankment of stack of<br />

excavated soil.<br />

2.6.0 Quality Control<br />

The Contractor shall establish and maintain quality control for the various<br />

aspects of the work, method, materials and equipment used. The quality<br />

control operation shall include but not be limited to the following items of<br />

work :<br />

a) Lines, Levels and Grades : i) Periodic Surveys<br />

ii)<br />

Establishment of markers,<br />

Boards etc.<br />

iii) Checking levels and slopes<br />

of the graded surface.<br />

b) Area filling : i) Checking the quality of fill<br />

material<br />

ii) Checking moisture content<br />

of the fill.<br />

iii) Checking the degree of<br />

compaction.<br />

2.6.1 Any work which fails to conform to the specifications will be subject to the<br />

issue of a Non-conformance Report in line with the Quality Control<br />

Procedure to be implemented at site. Corrective or remedial action, design<br />

modifications or product rejection will be reviewed in accordance with the site<br />

(PCA.774.S034sca) V.II-D2/S-I : 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!