5:2.2 Samples<br />

5,2.3 Deslfin Mix<br />

OCPL-K9A01<br />

The master programme may have to be reviewed and updated by the<br />

Contractor quarterly or at more frequent intervals as may be directed by the<br />

Engineer depending on the exegencles of the work.<br />

Oetalled day to day programme of every month is to be submitted by the<br />

Contractor betore the commencement ot the month.<br />

Samples ot aU materials proposed to be used shall be submitted as directed<br />

by the Engineer, in sufficient quantities. tor approval. All samples shall be<br />

submitted _II In advance of starting work at site. Approved samples wilt be<br />

preserved by tha Engineer for tuture reference. The approval ot the Engineer<br />

shall not, in any _y, relieve the Contractor of his responsibility ot supplying<br />

materiaI'ot specified quaQty.<br />

Design mix as per details of this specifICation giving proportions" ot<br />

ingredients, sources ot aggregates and cement along with accompanying test<br />

results of trial mixes as per relevant IS Specifications shall be submitted to<br />

the Engineer, for his approval, before it can be used on the work.<br />

5.2.4 Detail Drawings<br />

Following items shall be provided by the Contractor which are to be approved<br />

by lIle OWner and Consultant.<br />

a) Detail drawings and destgns of torm work includin9 scaffolding to be<br />

used. If sllpform method of construction is adopted. then detail<br />

drawings showing all the arrangements for slipform technique<br />

including methods tor reducing Internal diameter and providing<br />

raquired slopes on outer diameter.<br />

b) Detail drawings and bar bending schedules for concrete components.<br />

c) Shop drawings forstructunll.steel and 'metai work. including inserts<br />

'. etc. The Contractor shan submit his proposal for testing site and shop<br />

. joints provided insteel·lilembenI. ....... . ' ...<br />

d) Detail drawings for templates and temporary supports tor<br />

embedments.<br />

e) Category wise raql,lirements of MS, tor and structural steel including<br />

GI fiats of various sizes for procurement.<br />

f} Detailed drawings of steel llues indicating details of joints, supports<br />

and restraints including insulation blocks. and details of expansion<br />

compensator.<br />

g} Detailed drawing of hoisting arrangement tor men and material<br />

satisfying statutory regulations laid down tor safety purpose.<br />

(l'CA.C0.()()3.S80SCSA24,doc.doe) V.lI·02l5-XXIV : 36 .<br />

" ('