DCPL-K4A02<br />

e) Minimum two tests per 8000 cu.m. of soil for determination of soil<br />

classification. Test to be done in accordance with IS: 2720 (Part-IV).<br />

f) Minimum 10 (ten) density measurements shall be plotted to<br />

establish moisture content-dry density relationship.<br />

4.2.0 Acceptance Criteria<br />

4.2.1 Excavation<br />

4.2.2 Area-filling<br />

On completion of excavation, the dimensions of the area will be checked<br />

as per the drawings after the area is completely dewatered. The work will be<br />

accepted after all undercuts have been set right and all over excavations<br />

filled back to required lines, levels and grades by compacted earth. Over<br />

excavation of the sides will be made good free of cost by the Contractor.<br />

The excavation work will be accepted after the above requirements are<br />

fulfilled & all temporary approaches encroaching inside the required<br />

dimension of the excavation have been removed.<br />

The degree of compaction required will be as per the stipulations laid down<br />

in appropriate sections of this specification. The actual method for<br />

measuring the compaction achieved will be as decided by the Engineer.<br />

The work of area filling will be accepted after the Engineer is satisfied<br />

with the degree of compaction achieved.<br />

5.0.0 INFORMATION TO BE SUBMITTED<br />

5.1.0 With Tender<br />

Following details of Machineries, transport vehicles, equipment proposed<br />

to be used for excavation, area-filling and compaction have to be submitted<br />

along with the tender :<br />

i) Equipment, machinery & earthmoving vehicles, available with the<br />

Contractor and proposed to be used for excavation and haulage<br />

giving details regarding make, model, capacity, year of manufacture,<br />

numbers available for this contract and general condition.<br />

ii)<br />

iii)<br />

Equipment proposed to be used for area filling and compaction giving<br />

similar details as in item 5.1.0 (i) above.<br />

Method of transportation.<br />

5.2.0 After Award<br />

After award of contract the successful tenderer shall submit the following for<br />

approval and adoption:<br />

a) Within 15 days of Award of the contract, the Contractor shall submit a<br />

(PCA.774.S034sca) V.II-D2/S-I : 19