TITLE SPEC<strong>IF</strong>ICATION NO. PES-509-02A<br />

LIGHTNING PROTECTION &EARTHING<br />

OF CHIMNEY<br />

(SUPPLY & INSTALLATION)<br />

VOLUME<br />

II B<br />

SECTION<br />

D<br />

REV NO. 0 DATE 08.02.2002<br />

SHEET 3 OF 4<br />

demonstrate that the equipm ent shall co mply with the requirem ents of this<br />

specification.<br />

5.2.2 The tolerance in dimensions shall be in accordance with appropriate Indian Standards.<br />

5.2.3 Forged steel below 10mm thick is subject to Magnetic Particle Testing.<br />

6.0 DRAWINGS, DATA & DOCUMENTS<br />

6.1 Data sheet-A of this specification gives th e details of m aterials to be used for the<br />

Lightning Protection system for Chimney.<br />

6.2 The tenderer shall subm it his design(s) a nd drawings for Dir ect stroke Lightning<br />

Protection System of Chimneys for purchaser’s evaluation/scrutiny and approval.<br />

6.3 The contractor shall furnish his design(s) and installation drawings for approval.<br />

6.4 The contractor shall furnish the requisite num ber of prints & RTF’s of all drawings as<br />

specified elsewhere in this specification.<br />

6.5 The site modifications/deviations shall be m arked on the latest revision of the drawings<br />

& submitted as ‘As Built’ drawings to the purchaser after completion of installation.<br />

6.6 Tenderer shall submit all filled up schedules as per <strong>Volume</strong>-III.<br />

6.7 The tenderer shall subm it reports on Type tests & Special tests conducted on lightning<br />

protection materials & accessories.<br />

7.0 COMPLETENESS<br />

7.1 The offer for supply and erection shall be co mplete in all respects & shall include all<br />

materials, tools and appliances, whether speci fied or not, required for the com pletion of<br />

the job.<br />

7.2 Supply/arrangements of all accessories and material etc. shall be the responsibility of the<br />

contractor.