DCPL·K9A01<br />

4.0.0 TESTING AND ACCEPTANCE CRITERIA<br />

4.1.0 General<br />

4.2.0 Cement<br />

4.3.0 VVater<br />

4.4.0 Concrete<br />

The Contractor shall cany out aU sampling end testing in accordance with the<br />

relevant IS SpeCifications and as supplemented herein, for the following items<br />

or any other item as may be required by the Engineer unless otharwise<br />

specified in this specification. Tha Contractor shall get the specimens tested<br />

in labolatofy. approved by the Engioeer and shall submit to him, the original<br />

test results in triplicate, within seven days after the completion of the test.<br />

Engineer may present himself while such tests are being carried out.<br />

Representative samples shall be tAken as per the relevant IS SpecifICation<br />

from each consignment of Cement received from the<br />

PurchaserlManufacturerlSupplier for canying out the tests for fineness (by<br />

hand sieving), setting time, compressive strength and soundn~ss tests, and<br />

the Contractor shall cany out the. above tests as per relevant Indian<br />

Standard. If the cement Is suppfled by the Contractor the test shan be carried<br />

out by him. The Contractor shaD cany oljt any or aU the tests on aggregates<br />

as may be required by the Engineer, in accordance with IS:2386 Parts-I to<br />

VIII. The aoceptance crfteria of the samples tested shall be in accordance<br />

withthe requlremenis of the relevant IS specifications..<br />

Sampling and testing of water being used for concrete works shall be carried<br />

out as per IS:3550, by the Contractor, at regular Intervals and whenever<br />

directed by the Engineer. ThiI final acc;eptance crfterion In case of doubt<br />

shan be as per IS:3025.<br />

The Contractor shall take cubes for worXs test as per requirement laid down<br />

,.<br />

in 1$:516 regularly from the day's pour. The.number of test cubes to be taken<br />

~.<br />

.. sheU be. as per 15:456. The. Engineer may also ~ his discretion In deciding .<br />

,.<br />

the rate of cubeS' to be: taken. The. aeeeptance criteria is 'to meet tlie<br />

~~< requirement of 15:456. If the cube test results indicate that some portions or<br />

the work is below the required strength, the Engioeer may order demolition of<br />

f<br />

that portion of work which is below strength and ask the Contractor to<br />

'1<br />

;:. rebuild, provided e satisfactory method of load testing Is not possible. Such<br />

{ testing or demolishing and rebuilding shall be carried out by the Contractor.<br />

?,.<br />

:1<br />

4.5.0 Steel Rue<br />

All site and shop welded joints shaH be inspected and tested in accordance<br />

.£<br />

.: $1<br />

"'<br />

,.<br />

i<br />

I<br />

F:<br />

."<br />

with clause 4.00.00 of Technical specification for Feb. and Eraction of<br />

structural steel work.<br />

(PCACO-OO3.S805CSA24.doc.doc) V.U..o2lS-XXIV : 34<br />