Ii)<br />

Design of scaffolding and staging.<br />

DCPL-K9A01<br />

il1) Description of materials inCluding admixtures 10 be used for<br />

consltudion.<br />

iv) Manpower ptennlng, conl;truction spaces required , standby<br />

arrangement:<br />

vi)<br />

vii)<br />

viii)<br />

be)<br />

Rate of Slip-fonning.<br />

Proposed workabilitY requirement of concrete and type of cement &<br />

admixture to be used.<br />

Quality assurance programme.<br />

Method ofTraansportalion of melerial<br />

x) Method of curing and rectification of defects.<br />

xi)<br />

xii)<br />

xiii)<br />

Planned'intemlption, if proposed, and activilies during planned<br />

interruption. T reelment of consltuction joint. .<br />

. .<br />

COntingency solution for unptannad interruptions.<br />

Time of completion.<br />

While selecting the COntractor, due consideration will be given to the merit of<br />

the above mentionad statement proposed by the Tenderer.<br />

Not withstanding what have been specified In earlier clauses, following guide<br />

lines are being presented whk:h should be kept In view by Intending<br />

Tenderers. whUe quoting for Slip-fonn method of consltuction :<br />

1. Care to be taken to prevent dragging of concrete aiongwith upward<br />

movement of the shuttering. For this purpose following' steps are<br />

advisable : .<br />

a) ,Shutter··P\ate$ have to be smooth and should be 'thoroughly<br />

clean. BefO/B fildng them in position all the surfaces which Will<br />

be coming in contact with COIICI1Ite to have a coat of epoxy<br />

paint.<br />

b) In arees where concrete thickness Is 750 mm or more rate of<br />

pouring should be such that minimum slipping of shuttering is<br />

100 mm per hour.<br />

c) Mix design should be so done that it will be self: lubricant at<br />

the contact face of shutter and (XlIlCrete and thus reduce<br />

friction. Suitable cement of approved manufacturer<br />

(conforming to relevant I.S. SpecIfication) may be used for the<br />

purpose. An optimum ratio of coarseJllne aggregate should be<br />

(PCACO-O03.S805CSA24.doe.doe) V.II-02IS-XXIV: 18<br />

\ .. ';. ~; .