TITLE:<br />

TECHNICAL SPEC<strong>IF</strong>ICATION FOR<br />

REINFORCED CONCRETE<br />

CHIMNEY<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SECTION - C SUBSECTION : I<br />

REV.NO. 0 DATE 18.09.2010<br />

SHEET<br />

OF<br />

6.2 The contractor shall exercise great care to ensure that these inserts are accurately held<br />

in position and maintained undisturbed during placing and vibrating of concrete and<br />

that pipe sleeves do not get filled in with concrete. I f found desirable the Engineer<br />

may direct the contractor to tie or weld the inserts to the reinforcement to ensure that<br />

are maintained undisturbed. All such works shall be done by the contractor at no extra<br />

cost.<br />

6.3 The contractor shall ensure that the anchor bolts, inserts etc. are properly protected as<br />

under-<br />

a) From w eather by a pproved m eans s uch a s w hite l ead putty and wrapping them<br />

with gunny ba g or c anvas or by ot her m eans a s directed by the engineer.<br />

However before actual fixing in position the anchors shall be cleaned of all oil and<br />

grease and the protruding positions sha ll aga in be cl eaned and grease af ter<br />

concreting is over.<br />

b) From damage due to movement of contractor's labour staff, materials and<br />

equipment a nd pr oviding s uitable gua rds a round t hem a s di rected by the<br />

Engineer-in- charge.<br />

6.4 In the event of pockets, bolts, pipe sleeves, channels and other inserts not being found<br />

in correct position whole work shall be liable to be rejected.<br />

6.5 Removal of bolt hole pockets shall only be done by w elding. In no c ase burning of<br />

bolt hol e f orms s hall be pe rmitted on r emoval of f orms, the pockets shall be<br />

temporarily pl ugged by t he hessian c ement ba gs or ot her m ethod t o prevent them<br />

from getting filled in with dust debris, concrete etc.<br />

7.0 QUALITY ASSURANCE PLAN<br />

The contractor shall submit Quality Assurance Plan for complete works after awards<br />

of contract and shall get for the same approved by employer/owner.<br />

8.6 SUPERVISION BY CUSTOMER OR THEIR CONSULTANT<br />

The owner or his r epresentative m ay depute t heir r epresentatives f or che cking and<br />

supervision of important stages of work. The contractor shall be required to provide<br />

all f acilities f or ins pection of w orks by the customer/consultants or the ir<br />

representatives w ithout a ny c ost i mplication t o t he e mployer or E ngineer. Any<br />

defects in quality of w ork, or de viations f rom dr awings s pecifications, poi nted out<br />

during s uch i nspection s hall be m ade good by the contractor in the same way as<br />

pointed out the Engineer without any cost implications.