TITLE:<br />

SCOPE OF WORK<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SECTION - A<br />

REV.NO. 0 DATE 18.09.2010<br />

SHEET<br />

OF<br />

extra t hereupon, the sam e sha ll be cl arified by t he E ngineer-in-charge or hi s<br />

authorised r epresentative a nd hi s e xplanation s hall be binding upon the contractor.<br />

Directions as given by the Engineer-in-charge or his author ised representatives being<br />

considered ne cessary f or t he pr oper c ompletion of t he work as i mplied by t he<br />

specifications a nd dr awings, e ven t hough s uch w orks a nd things are not specially<br />

shown and described in the said drawings and specifications shall be binding on the<br />

contractor. Supplementary dimensions or dr awings m ay be gi ven by t he<br />

Engineer/Engineer-in-charge in addition to those already given and changes may also<br />

be effected in them and the contractor shall have to execute the works on the basis of<br />

the s upplementary dr awings or c hanged dr awings and specifications without any<br />

additional claim whatsoever.<br />

3.0.0 DOCUMENTS MUTUALLY EXPLANATORY AND SECTION C.<br />

3.1.0 Contractor shall read the parts of t he specification relevant to the contract and<br />

shall ignore the other parts of t he sp ecification. In cas e of amb iguity between<br />

BOQ, part C and part D of specification, the following priority for acceptance of<br />

items may be followed :-<br />

a) BOQ b) Part C c) Part D<br />

3.2.0 GENERAL<br />

3.2.1 The ove rall c oordination f or a ll w orks s pecified i n t he s cope of work will be the<br />

responsibility of t he c ontractor. T he c ontractor shall also provide adequate<br />

supervisory personnel for works executed under his Scope of Work.<br />

3.2.2 Any clarification from customer/customer's representative shall have to be furnished<br />

by the contractor.