DCPL-K4A02<br />

4.2.7 Galvanizing<br />

4.3.0 Tolerance<br />

4.4.0 Acceptance<br />

All galvanizing shall be uniform and of standard quality when tested in<br />

accordance with IS:2633 - Method for testing uniformity of coating on<br />

Zinc Coated Articles and IS:4759 - specification for Hot-Dip Zinc Coatings<br />

on Structural Steel & other allied products.<br />

The tolerances on the dimensions of individual rolled steel components<br />

shall be as specified in IS:1852 - specification for rolling and Cutting<br />

Tolerances for Hot-rolled Steel Products. The tolerances on straightness,<br />

length etc. of various fabricated components (such as beams and girders,<br />

columns, crane gantry girder etc.) of the steel structures other than steel<br />

railway & road bridges, structures subjected to dynamic loading (like wind,<br />

seismic etc.) and thin walled construction (like box girders) shall be as<br />

specified in IS:7215 - Tolerances for Fabrication of Steel Structures.<br />

Should any structure or part of a structure be found not to comply with any<br />

of the provisions of this Specification, the same shall be liable to rejection.<br />

No structure or part of the structure, once rejected, shall be offered again<br />

for test, except in cases where the Engineer considers the defects<br />

rectifiable. The Engineer may, at his discretion, check the test results<br />

obtained at the Contractor's works by independent tests at an approved<br />

laboratory and should the items, so tested, be found to be unsatisfactory.<br />

When all tests to be performed in the Contractor's shop under the terms of<br />

this contract have been successfully carried out, the steelwork will be<br />

accepted forthwith and the Engineer will issue an acceptance certificate,<br />

upon receipt of which, the items will be shop painted, packed and<br />

despatched. No item to be delivered unless an acceptance certificate for the<br />

same has been issued. The satisfactory completion of these tests or the<br />

issue of the certificates shall not bind the Owner to accept the work,<br />

should it, on further tests before or after erection, be found not in<br />

compliance with the Contract.<br />

4.5.0 Delivery of materials<br />

4.5.1 General<br />

The Contractor will deliver the fabricated structural steel materials to site<br />

with all necessary field connection materials in such sequence as will<br />

permit the most efficient and economical performance of the erection work.<br />

(PCA.774.S034sca4) V.II-D2/S-IV : 21