3.11.0 Culverts<br />

DCPL-K4A02<br />

for the drains shall be as per Dwg. and as mentioned in the Schedule of<br />

items. Lining of drains may be of bricks or cement concrete blocks of M15<br />

grade concrete as shown on drawing or as directed by the Engineer. If<br />

instructed by the Engineer or shown on drawing, drains may be of R.C.C.<br />

construction with necessary slopes.<br />

Excavation in trenches for foundation of culverts and wing walls shall be<br />

done with side slopes as per the instructions of Engineer after clearing the<br />

site, etc. as per specifications of earthwork. Backfilling with ramming and<br />

watering shall be done after construction of the foundations.<br />

The construction of culverts shall be done true to lines and levels and as<br />

shown on the drawing. The specification for Masonry and/or Plain and<br />

Reinforced Cement concrete shall be followed, as applicable.<br />

3.12.0 Pipe Culverts and Drainage Pipes<br />

3.12.1 Materials<br />

The drainage pipes unless otherwise shown on drawings or instructed by the<br />

Engineer shall be made of R.C.C. and shall be either Class NP2 or NP3.<br />

Pipe culverts shall be made of reinforced concrete pipe and shall be of class<br />

NP3 or of RDSO class for railway as decided by the Engineer or shown in<br />

the drawing. All pipes shall meet the requirements of IS:458- Latest edition<br />

and shall be procured from approved manufacturers with collars as per<br />

manufacturer's standard specifications. The tenderer shall specifically<br />

mention the particular manufacturer's product he proposes to use. Cement<br />

shall be ordinary Portland Cement as per IS:269 - Latest edition.<br />

Aggregates shall be as per IS:383 - Latest edition - Maximum size shall not<br />

exceed one third the thickness of the pipe or 20 mm whichever is smaller.<br />

Fine aggregates for concrete shall be as per IS:383 - Latest edition.<br />

3.12.2 Laying of Pipes<br />

Laying of concrete pipes shall correspond to IS:783 - Latest edition - and<br />

to specification given below :<br />

a) The foundation bed for pipe shall be excavated true to lines and<br />

grades shown on the drawings or as directed by the Engineer.<br />

When trenching is involved its width on either side of the pipe shall<br />

not be less than 150 mm nor more than one-third the diameter of pipe<br />

unless otherwise instructed/permitted by the Engineer. The sides of the<br />

trench shall be as nearly vertical as possible. Side slope, shoring,<br />

bailing out water, etc. as required shall be done by the Contractor<br />

without the Owner. Side slips, if there be any, shall be removed by the<br />

(PCA.775.S034sca7) V.II-D2/S-VII : 25